Control measurement in construction

Control measurement

Instrumental verification of completed work volumes

Control measurement establishes the volume of construction and installation work actually performed. Visual inspection, instrumental measurement and calculation are used together.

For each estimate item a three-column statement is prepared: per document, actual, difference.

Work procedure

  1. Receiving estimate and acts

  2. Desk review

  3. On-site measurement with both parties

  4. Comparison sheet and act

Questions

Do we have to stop the works?

No. Measurement does not interrupt the works.