Control measurement in construction

We verify that completed construction, installation and repair works comply with the design, estimate and as-built documentation, and analyse the quantities and value of the completed work.

How the problem arises

The contractor submits a completion act: so many m³ of concrete, so many m² of plaster, so many tonnes of rebar. The client signs and pays.

Later it turns out the volume was overstated, material was swapped for a cheaper one, or estimate norms were misapplied.

The audit measures what is actually on site and compares it with the document.

Services

Instruments

Measuring instruments and verification

Full list →
InstrumentMeasurement rangeCertificateValid until
Laser distance meter SNOWAY SW-M100up to 50 m, error ±2 mm№ 20745-0115/202617.02.2027
Laser distance meter SW-50Gup to 50 m, error ±2 mm№ 20785-0115/202617.02.2027
Laser distance meter ELM-40up to 40 m, error ±2 mm№ 20796-0115/202617.02.2027
Electronic micrometer MKU0–25 mm, error ±0.001 mm№ 20688-0115/202617.02.2027
Temperature and humidity data logger Enkor 4127Temperature and humidity logging№ 20745-0115/202617.02.2027

Outcome

As a result, you will receive

  1. Control measurement act

  2. Volume comparison: document / actual / difference

  3. Estimate recalculation — difference in UZS

Projects

Completed work — 95

View in registry →
WorkClientYear
Control measurementООО “Salom Chimyon”2025
Control measurement of construction and installation worksOOO "FAYZLI XAST IMOM"2025
Control measurementООО «SHOVOT TEXTILE PROJECT INVEST»2025
Control measurementООО «TECHNO PAINT GROUP»2025
Control measurementООО «SHOVOT LOGISTIC SERVIS»2025
Control measurement of construction and installation worksООО «NBU JEWELRY GROUP»2025

Briefly describe the facility — an engineer will determine which requirement applies and the scope of work during the first conversation.

Send a request